Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Lp smart siding trim installation instructions.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
3 16 gap at butt joints between horizontal sections and where the siding meets doors windows and corner trim.
How to install lp smartside trim siding.
Diamond kote building products is a preferred prefinisher for lp smartside an engineered siding wood product.
Do not miter corner joints of band boards fascia corner trim etc.
Smart shield is the combination of smartside premium engineered siding from louisiana pacific with a premium 30 year factory finish.
Board and batten with vertical panel siding.
0 375 in x 48 in x 96 in.
As in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
Lp smartside trim and fascia installation instructions.
0 4375 in x 48 563 in x 95 875 in item 88997 model xssp25915.
For more information about lp smartside click here.
It used to be stucco but moisture intrusion problems with stucco siding made many high end home builders start using james.
Along the trim if specified by the siding application instructions.
We offfer rigidstack siding rigidmount blocks trim and weatherproofing packages.
The manufacturer requires proper fastening of the product to the home.
Lp smartside lap siding installation using h molding.
Lp smartside is the new high end siding of choice here in minnesota.
See diagram 2e 4a cutting 4b moisture control fastening instructions caulked butt joint gap 3 16 and seal 1 installation 24 max.
Lp smartside trim siding products let you redefine traditional building materials with treated engineered wood products that are designed to offer game changing durability beauty and workability.
Lp smartside trim fascia 4.
Smartside 76 primed engineered treated wood siding panel common.
The nail heads should be driven to the top of the siding only and not below where visible product fibers can be seen.