0797 115 0241 07947 509 659.
Make lead back gutter chimney.
If the chimney exits the roof that the apex there will not be a gutter.
We supply lead back gutters to suit any chimney flashing and orientation.
It can be called a lead tray.
Apply the oil before any rain and at the end of the day s work.
These back gutters are all made to order to ensure you get the best product for your property.
A new back gutter may need to be made down on the ground and welded at the side returns and not have the crap beat out of it by a numpty roofer on the roof.
Lift flashings and coat the underside of the lead for about 50mm from the edge.
Made to measure chimney back gutter details.
Coat the lead before turning up clips around the edges.
Leadworx back gutter chimney flashings are designed and fabricated to suit any chimney size and orientation using code 4 sheet lead milled to british standard bs en 12588.
Call us with your specific measurements by following our easy measuring guide provided.
This should move the water from behind the stack to continue to follow down the roof either side of the chimney.
Remember to coat between laps.
And if the back gutter has aged then what about the rest of the lead at the same time.
Sheet lead back gutters which are part of chimney flashing to suit any chimney and orientation.
All these items are made from code 4 sheet lead to bs en 12588.
All sizes and roof pitches taken into consideration.
Back gutter any width and pitch to suit chimney roof.
One coat is all that is needed.
Apply the oil to all newly installed lead items large or small.